We built the Ecosys I and Ecosys II plants, which at the time had a combined capacity to treat 600 gallons of waste water per second.
The project began operations in November 1994 with an initial 10-year operation term and a 50% stake for GMD.
These were the first plants developed under the Build-Operate-Transfer (BOT) model in Mexico. |
|
The Ecosys I and Ecosys II water treatment plants have a combined capacity to treat 600 gallons of water per second. |